Preparatory heating phase

‘Preparatory heating phase’ means heating the warm water underfloor heating to dry the screed. This is carried out by the floor layer. The floor layer then measures the residual moisture in the heated screed. Once the limit value specified by the manufacturer has been reached, installation of the top floor can begin.